The Contractor Checklist: 7 Questions to Ask Any Roofer

Ask these before you sign anything. For each one there's a good answer and a warning sign — knowing the difference is most of the job.
Print this or keep it open on your phone while you talk to them.
| Stage | Questions | Why this stage matters |
|---|---|---|
| Before they start | 1. Insurance certificate · 2. Licence number | If these are wrong, nothing else matters |
| Scope & price | 3. Who does the work · 4. Rotten decking price | Where surprise charges come from |
| After it's done | 5. Warranty split · 6. Payment schedule · 7. Permit | Decides what happens when something goes wrong |
1. Can I see your certificate of insurance?
There are two policies that matter: general liability (damage to your property) and workers' compensation (injury to their crew on your property). Ask for both.
A good answer: they send the certificate without hesitation, the dates are current, and they're comfortable with you contacting the insurer to confirm it's active.
A warning sign: "we're fully insured" with no paperwork, a certificate that expired last year, or irritation that you asked. This is the single most important question on the list — ask it first, and don't let a good price talk you out of it.
| Check | What it covers | If it's missing |
|---|---|---|
| General liability | Damage to your house and property | Damage becomes your problem |
| Workers' compensation | Injury to their crew on your roof | An injury claim can come back to you |
| Current policy dates | That the cover is active today | An expired certificate is no certificate |
2. Are you licensed for this work here, and what's the number?
Roofing licence rules vary a lot — some states license contractors at state level, some at county or city level, and a few barely regulate it at all. So the useful question isn't "are you licensed" but "under what, and what's the number."
A good answer: a licence number offered without being chased, which you can then check against your state or county licensing lookup.
A warning sign: a number that doesn't match the business name on the estimate, or a licence belonging to someone who isn't actually on the job.

3. Will your own crew do the work, or subcontractors?
Neither answer is automatically wrong — plenty of good roofers use subs. What matters is that they tell you straight.
A good answer: a clear yes or no, plus who supervises on site and who your single point of contact is if something goes wrong at 4pm on a Friday.
A warning sign: vagueness. If they can't say who will physically be on your roof, the crew is likely being assembled per job.
4. What happens if you open the roof and find rotten decking?
This is the most common source of surprise charges in the whole trade. Nobody knows what's under the shingles until the tear-off starts, so the honest move is to price it before it happens.
A good answer: a specific price per sheet of plywood, written into the estimate up front, plus a commitment to show you the damage — photos at minimum — before replacing anything.
A warning sign: "we'll let you know if we find anything." That's an open cheque, signed by you, at the exact moment you have no leverage and half a roof.
5. What does the warranty actually cover?
There are two separate warranties and people constantly conflate them.
| Covers | Who backs it | Survives contractor closing? | |
|---|---|---|---|
| Manufacturer warranty | Defects in the materials themselves | The shingle or membrane maker | Yes |
| Workmanship warranty | Mistakes in how it was installed | The contractor | No |
A good answer: they separate the two without being prompted, give a term in years for each, and tell you plainly what voids them.
A warning sign: one blurred "25-year warranty" that turns out to be the manufacturer's material coverage only.

6. What's the payment schedule?
| Schedule | What it looks like | What it signals |
|---|---|---|
| Reasonable | Modest deposit, progress payments tied to milestones, balance after you've walked the finished job | They have supplier credit and stand behind the work |
| Warning sign | Most of the money demanded before materials arrive | The most reliable warning sign in roofing |
A good answer: a modest deposit, progress payments tied to actual milestones, and a meaningful balance due only after the work passes inspection and you've walked it.
A warning sign: a demand for most of the money before materials arrive.
7. Who pulls the permit, and is it in the estimate?
A good answer: the contractor pulls it, and the fee appears as a visible line item rather than vanishing into a lump sum.
A warning sign: a suggestion that you skip the permit to save money, or that you pull it yourself as the homeowner. Both shift risk onto you — and an unpermitted roof can surface years later when you try to sell.
Before you sign
Get it in writing, itemized. A verbal quote isn't a quote. The estimate should show materials, labor, tear-off, disposal, permit, and the per-sheet decking price separately — if it's one number with no breakdown, ask for the breakdown before you ask for a discount.
And get more than one. Three written estimates is the standard advice for a reason: it's the only way to know whether the middle one is fair.
Want a number to judge those quotes against? The roof cost calculator gives you a range with every line itemized, so you can see where a quote is padded.
You're reading this because you signed up for the tallysquare contractor checklist. We don't pass your email to contractors — see the about page.